Installing the timber-frame Shell

Floor, walls, roof — the weatherproof envelope goes up in 1-2 days on top of your steel-anchored foundation.

By Arden & Oak Technical Team 2 min readUpdated 2026-02-13

insulated shell erection is the dramatic bit — the day a bare foundation platform becomes a recognisable building. Because every panel is CNC-cut, numbered and delivered as a kit of parts, a two-person team can typically erect a full garden-room shell in 1-2 days including the roof.

The sequence

  • Floor panels first — laid across the steel-anchored bearers, mechanically fixed, edges taped
  • Wall panels next — corner panels stood up first, wall runs added between them, each joint splined and sealed
  • Structural bracing — steel or engineered timber lintels above openings
  • Roof panels last — dropped into place from a small manual crane, spanning wall-to-wall, sealed at every joint
  • Roof membrane — single-ply EPDM or TPO applied over the roof panels, welded at seams for a fully weathertight envelope

By end of day two

You have a fully weathertight, structurally complete building — sitting on a permanent foundation, with all its structural connections made, the roof watertight, and openings prepared for door and window installation. All subsequent work happens inside a dry building.